Plans Room

Value Place Hotel

2880 Center Port Circle, Pompano Beach, FL 33064

All bids are due by April 14, 2008 to Bob Proper in Fort Lauderdale. 954-467-2888 email Bob

If you would like to purchase a hard copy of plans contact Pat or Ron at Ace Blueprinting 954-771-0104

Value Place Hotel Date Revision
 SpecBook    
Cover Sheet  2/28/2008  
Building Code & Life Safety  2/28/2008  
ADA1 Reference Sheets  2/28/2008  
ADA2 Reference Sheets  2/28/2008  
ADA3 Reference Sheets  2/28/2008  
CIVIL    
 All Civil Sheets    
C1.0 Standard Legend & General Notes  2/28/2008  
C2.0 Paving Grading & Drainage Plan  2/28/2008  
 C3.0 Cross Sections  2/28/2008  
 C3.1 Paving Grading & Drainagel Details  2/28/2008  
 C3.2 Paving Grading & Drainage Details  2/28/2008  
 C3.3 Paving Grading & Drainage Details  2/28/2008  
 C3.4 Paving Grading & Drainage Details  2/28/2008  
 C4.0 Water & Sewer Plan  2/28/2008  
 C5.0 Water & Sewer Details  2/28/2008  
 C5.1 Water & Sewer Details  2/28/2008  
 C5.2 Water & Sewer Details  2/28/2008  
 C6.0 Pavement Markings & Signage Plan  2/28/2008  
 C7.0 Stormwater Pollution Prevention Plan  2/28/2008  
 FA1.0 Fire Access Plan  2/28/2008  
 LANDSCAPE / IRRIGATION    
 All Landscape Sheets    
 Landscape Cover  2/28/2008  
 SP1 Landscape Site Plan  2/28/2008  
 TR1 Tree Action Plan  2/28/2008  
 LP1 Landscape Plan  2/28/2008  
 LP2 Landscape Details  2/28/2008  
 LP3 Landscape Specs  2/28/2008  
 IR1 Irrigation Plan  2/28/2008  
 IR2 Irrigation Details  2/28/2008  
 STRUCTURAL    
 All Structural Sheets    
 S1 Foundation Plan  2/28/2008  
 S2 Framing Plan 2nd Floor  2/28/2008  
 S3 Framing Plan 3rd & 4th Floor  2/28/2008  
 S4 Roof Plan & Foundation Details  2/28/2008  
 S5 Framing Details  2/28/2008  
 S6 Framing Details  2/28/2008  
 S7 Framing Details  2/28/2008  
 S8 General Notes  2/28/2008  
 S9 Braced Wall Details  2/28/2008  
 ARCHITECTURAL    
 All Architectural Sheets    
 A1.1 First & Second Floor Plans  2/28/2008  
 A1.2 Third & Fourth Floor Plans  2/28/2008  
A1.3 Roof Plan & Details  2/28/2008  
 A2.1 Exterior Elevations  2/28/2008  
 A3.1 Building Sections  2/28/2008  
 A3.2 Wall Sections  2/28/2008  
 A3.3 Wall Sections & Details  2/28/2008  
 A4.1 Enlarged Floor Plans  2/28/2008  
 A5.1 Interior Elevations  2/28/2008  
 A5.2 Interior Elevations  2/28/2008  
 A6.1 Stair Plans Sections & Details  2/28/2008  
 A6.2 Elevator Lobby Plans Sections & Details  2/28/2008  
 A8.1 Partition Schedule & Finish Schedule  2/28/2008  
 A8.2 Door Schedule & Door & Window Details  2/28/2008  
 A8.3 UL Assemblies  2/28/2008  
 A8.4 UL Assemblies  2/28/2008  
 PLUMBING / MECHANICAL    
 All Mechanical Sheets    
 MP1 Mechanical Plumbing Notes & Legends   2/28/2008  
 MP2 Mechanical Specs   2/28/2008  
 MP3 Mechanical Specs   2/28/2008  
 M1 Mechanical Floor Plans 1st Floor   2/28/2008  
 M2 Mechanical Floor Plans 2nd & 3rd Floor   2/28/2008  
 M3 Mechanical Floor Plan 4th Floor   2/28/2008  
 All Plumbing Sheets    
 P1 Plumbing Floor Plan 1st & 2nd Floor   2/28/2008  
 P2 Plumbing Floor Plan 3rd & 4th Floor   2/28/2008  
 P3 Plumbing Floor Plan 1st & 3rd Floor   2/28/2008  
 P4 Plumbing Waste & Vent & Domestic Water Risers   2/28/2008  
 ELECTRICAL    
 All Electrical Sheets    
 E1 Electrical Riser Diagram & Communications Specs   2/28/2008  
 E2 Electrical Panels & Schedules   2/28/2008  
 E3 Electrical Plans 1st & 2nd Floor   2/28/2008  
 E4 Electrical Plans 3rd & 4th Floor   2/28/2008  
 E5 Enlarged Electrical Plans   2/28/2008  
 E6 Electrical Specs   2/28/2008  
 E7 Fire Alarm Specs  2/28/2008  
 E8 Fire Alarm System Plans  2/28/2008  
 E9 Electrical Site Plan  2/28/2008  
 E10 Photometric Site Plan  2/28/2008  
 E11 Fire Alarm Plan 1st & 2nd Floor  2/28/2008  
 E12 Fire Alarm Plan 3rd & 4th Floor  2/28/2008  
 E13 Fire Alarm Riser  2/28/2008  
     
     
     
     
"));